Jin Oriental Cuisine | Croydon
SBP Group was approached by the client to take a shipping container and turn it into a fully operating commercial grade kitchen. This project scope was to ‘design and construct’ a continental kitchen within the boundaries of the newly renovated dinning hall at Croydon Central. With minimum fit-out criteria, SBP Group was able to integrate the outdoor vibe into the design with Corten signage in letting and isometric shapes as well as faux plants. Stakeholder meetings prior to construction saw the project team navigate many design intricacies through alternate solutions with custom fabricated Stainless Steel finishes.
- Industry – Hospitality
- Project Value – $260K
- Location – Croydon, Vic
- Interior Designer – Mariljohn
- Exterior Designer – dskribe design
- Build time – 5 weeks
- Project Size – 28m2